
Construction Timelapse
02/08/23 - 04/09/24
Keystone’s central courtyard, 07/2024
A Keystone hotel room prior to painting and flooring installation, 07/2024
Keystone exterior, 07/2024
Keystone parking garage, 07/2024
View of Downtown San Jose from the roof of Keystone, 07/2024
A Keystone hotel room prior to painting and flooring installation, 07/2024
The Keystone workout room, 07/2024
The Keystone lobby, 07/2024
The Keystone lobby, 07/2024
Exterior of Keystone, 08/2024
Exterior of Keystone, 08/2024
Keystone's central courtyard, 12/2024
A Keystone hotel room with flooring and paint, 12/2024
Carpet being installed in a hallway, 12/2024
The Keystone workout room, 12/2024
The Keystone indoor/outdoor space, 12/2024
The Keystone indoor/outdoor space, 12/2024
Outdoor BBQ space, 12/2024
The Keystone lobby, 12/2024
Keystone exterior, 12/2024





Drone Footage
Concrete Pour
Column Pour
Ramp Pour
Concrete Pour
Concrete Finishing
Concrete Finishing
The crane being removed.
The crane being removed.